Serving Proudly As The Voice Of Valley County Since 1913

Scottie Field Recharged Daily Tidbits

Day 1, Aug. 28

What will the proposed $8.25 Million Dollar Facility Improvements Bond include?

#1 – Replace the failed 80-year old boiler at Glasgow High School to assure our students will have adequate heat in the winter months.

#2 – Extensively repair damaged roofs at Glasgow High School and Glasgow Middle School to assure that we can keep the inside of our buildings free from the outside elements and avoid partial or potentially complete structural collapse.

#3 – Replace the failing Asphalt Track with a Post-Tensioned Concrete All-Weather Track at Scottie Field to assure we can continue to hold annual regular season events and large postseason events for the community of Glasgow.

#4 – Replace the unsafe natural grass Football Field with Synthetic All-Weather Field Turf at Scottie Field to assure player and officials’ safety and turn the complex into a “Community Bowl” that can be used year-round by the youth and elderly of Valley County.

#5 – Replace the partially-failed incandescent lights with cost-effective LED light technology at Scottie Field to assure the facility can be used for school and community events in the evenings. 

#6 – Fix the traffic circle in front of Irle Elementary School to alleviate student and parent concerns and make the area safer and more efficient during high-frequency travel times (AM drop off and PM pick up).

 

Reader Comments(0)

 
 
Rendered 11/02/2024 13:08